 |
| Press Release 2006 |
 |
Emerald Energy Plc - 19 September 2006
Emerald Energy Plc ("EMERALD" or the "Company") announces interim results for the six months ended 30 June 2006
Highlights
- Average daily gross production for the period was 3,677 bopd, an increase of 45% compared to the 6 month period to 30 June 2005;
- In Colombia, Emerald currently has ten production wells on 5 fields with nine in operation producing total some 4,200 bopd;
- Since February 2006 Emerald has participated in the drilling of 5 wells, 3 exploration and 2 development wells, resulting in 1 new discovery and 2 new wells on production;
- Drilling of the Tigris exploration well commenced on 10 September 2006 and is currently drilling ahead at 522 metres;
- In September 2006 Emerald signed a new Exploration & Production Contract with ANH for the Maranta block located in southwest Colombia.
To view the Interim results http://www.emeraldenergy.com/investor-interim-reports.htm
Back to 2006 Press Release Index |
|
|
 |
| © 2005 Emerald Energy Plc. All rights reserved. |
|